Home CodeDoc What does the file selection status line show (e.g., '12 files selected • 32 units • Free left: 50/50 • Estimated cost: $3.20')?

What does the file selection status line show (e.g., '12 files selected • 32 units • Free left: 50/50 • Estimated cost: $3.20')?

Last updated on Nov 10, 2025

Short Answer: The status line shows selected file count, total units consumed, free units remaining, and the estimated cost for the current selection.

Prerequisites

  1. Files selected in the file tree

Steps

  1. Select files or change filters in the file selector.
    The status line updates to reflect the selection.

  2. Use the updated estimate to decide whether to adjust selection or proceed.
    You have an immediate view of estimated cost before generating.

Troubleshooting

  1. Estimated cost does not update after selection changes.
    LikelyCause: Temporary UI delay or network issue.
    Action: Refresh the file selector, close and reopen the selection pane, or reload the page.

Note: Exact example string shown in UI: '12 files selected • 32 units • Free left: 50/50 • Estimated cost: $3.20'